News Contact Development

Application:  RV Park Development

A PDF version of this form can be found here: RV Park Development Tech Form

Property Owner Details

Name of Property Owner(Required)
Contact Information of Property Owner(Required)

Applicant Details

Name of Applicant(Required)
Contact Information of Applicant(Required)

Submittal Requirements

Application Fee

  • Check #
  • Amount $

Signed Fee Agreement

  • Check #
  • Amount $

Poudre Fire Authority Development Review Fee

Site Plan

Prepared by a registered land surveyor or a registered professional engineer, and include as a minimum the following:

  • Name, address and telephone number of applicant
  • Minimum scale 1″ = 100′
  • Interest of the applicant in the proposed park
  • Location, address and legal description of the entire proposed recreational vehicle park site
  • Existing zoning of subject property and all adjacent properties
  • Names and addresses of adjacent property owners

Engineering Plans and Specifications

Prepared by a registered land surveyor or a registered professional engineer:

  • Area and dimensions of the entire tract of land
  • Land uses occupying the adjacent properties
  • Number, size and location of the proposed vehicle sites and other parking areas
  • Location, right-of-way and roadway width, and surfacing material of roadways and walkways
  • Proposed interior vehicular and pedestrian circulation patterns
  • Location of service buildings, sanitary stations and any other existing or proposed structure
  • Location of water and sewer lines and riser pipes
  • Plans and specifications of the water supply, sewage disposal and refuse facilities
  • Locations and details of lighting, electric and gas systems
  • Plans for drainage, flood control and landscaping
  • Plans and specifications of all buildings planned within the recreational vehicle park
  • Letters of review from utility agencies stating whether they can provide services
  • Preliminary plat plan drawn on 24 inch by 36 inch sheet size in blue or black ink

Master Plan, if construction proposed in multiple stages

If development is proposed for construction in a series of stages, a master plan for the development of the entire tract of land must be submitted along with the detailed plans and specifications for the initial stage, as well as any subsequent stages.

NOTE: No construction or development can start until approved by the Town Board and a building permit issued. The Building Official and Town Engineer will inspect each new recreational vehicle park or space/site addition or construction on existing parks to determine compliance with applicable regulations. Occupancy is not permitted and no certificate of occupancy will be issued until the Building Official and Town Engineer have made the determination in writing. The Building Official and Town Engineer have the authority to enter the premises for inspection at any time without notice or approval.

Drop files here or
Max. file size: 20 MB, Max. files: 20.

    Consent

    *The Town and Applicant agree to conduct transactions related to submission and review of this application by electronic means, pursuant to the Uniform Transactions Act, Sec. 24-71.3-101, et seq., C.R.S. The Town or the Applicant may refuse to conduct other transactions by electronic means. If the Applicant does not agree to submit the application by electronic means, a physical paper application may be filed with the Town at 4750 Signal Tree Drive, Timnath, CO 80547.
    This field is for validation purposes and should be left unchanged.